Until early October, "next to the DC BLOX campus" was the strongest line in a land listing east of Conyers. A hyperscale campus was already approved and under construction, Georgia Power capacity was committed, and the county had shown it would approve the use.
On Oct. 6, 2026, the Rockdale County Board of Commissioners adopted Section 9.5.3 of the county's new Unified Development Ordinance, the last piece of the rewrite. Section 9.5.3 includes a capacity survey of existing and approved facilities within five miles of a proposed site. DC BLOX is on Rockdale's east side.
The capacity survey and DC BLOX
In unincorporated Rockdale, data centers are now allowed only by special use permit. On top of the standard SUP procedure, Section 9.5.3(M) requires a filing that many land sellers have not read yet:
"Data management and processing facility capacity survey documentation, which identifies all operational, existing, and approved facilities located within five (5) miles of the subject property. This documentation shall justify the need for the proposed facility in relation to existing and approved facilities..."
The survey also has to analyze public infrastructure capacity in that area, evidence of service demand, and how the project fits local land use and economic development goals. The same application needs letters from every relevant utility confirming that service is technically feasible, plus noise, water and energy plans and a decommissioning plan.
As of May 2026, according to the county's own data center fact sheet, Rockdale had one approved data center campus, DC BLOX on Farmer Road. The DC BLOX campus page, updated in October 2026, lists its Atlanta East campus at 1726 Farmer Road with four data centers, operational and in development, totaling 747,787 square feet and 154 critical megawatts committed and planned.
Location and design standards in the adopted UDO
Section 9.5.3 also includes location and design standards for data centers.
| Filter in the adopted UDO | What it requires |
|---|---|
| Zoning district | SUP only in OI, M-1 and M-2 |
| Distance to I-20 | Nearest property boundary within 1.5 miles of the I-20 right-of-way |
| Setbacks and buffers | 250 feet from residential uses or zoning, measured from the edge of a 100-foot evergreen buffer with a sound wall up to 8 feet; 1,000 feet from schools, childcare learning centers and day care facilities |
| Cooling and noise | Closed-loop systems, no evaporative cooling; 65 dBA daytime and 55 dBA nighttime at property lines next to less intensive districts; Tier 4 or higher generators, tested only 9 a.m. to 5 p.m. |
Sources for the table: Rockdale County's adopted UDO as amended Oct. 6, 2026, Sections 6.2.2 and 9.5.3.
Section 9.5.3 also requires service from Rockdale County Water Resources for public water and sewer where service is available.
Project Rock Forge was next door and was still denied
Project Rock Forge shows how the county weighed a site next to the incumbent. MMM Acquisitions LLC asked for four approvals covering 262.99 acres along NW Farmer Road and 2000 Irwin Bridge Road NW, plus 19.16 acres at 1901 and 1921 Rockbridge Road NW. The Rockdale Citizen reported that the requests would move the land from residential future land use categories to Technology Park. The September staff report described seven buildings of 423,000 square feet each, 2,961,000 square feet in total, phased through 2033.
The applicant's own filing argued that DC BLOX helped its case. Its letter of intent called the area one with "a clear and deliberate transition toward technology-oriented land uses," and a July 2026 county staff report noted that the requested designation lined up with the DC BLOX campus under construction southwest of the site. In the same report, county staff pointed out that the change would bring the Technology Park category west of Highway 138 for the first time. Staff also suggested it may be reasonable to discourage industrial development east of Rockbridge Road, where residential subdivisions are already established.
At the Sept. 24 hearing, attorney Michelle Battle, representing the applicant, said MMM had first pursued M-2 industrial zoning based on discussions with county staff about where data centers could be permitted, and was now asking for the less intensive Office-Institutional designation. "We never wanted that, truthfully," she said of M-2, according to the Rockdale Citizen's hearing coverage. She described more than $5 billion in planned investment and more than 54% of the site kept as green space, and argued that the applications were filed under the previous UDO. The paper noted that those figures were projections. County planning staff and the Planning Commission both recommended denial.
On Oct. 6, commissioners denied all four applications, the Rockdale Citizen reported, with Commissioner Doreen Williams recused. In that case, being next to DC BLOX, offering a fallback zoning request and pledging more than $5 billion were not enough to change the land-use map.
The vested-rights language was removed, and the question remains open
At the same Oct. 6 meeting, commissioners also considered language about vested rights. Staff had recommended a Sept. 30 version of Section 9.5.3 that included paragraphs A1 and A2. Staff said the county developed those paragraphs with its legal counsel to address properties that might claim vested rights based on steps taken before the new rules. Commissioners deleted both paragraphs before adopting the section, the Rockdale Citizen reported.
Deleting the paragraphs did not make the underlying question go away. Planning and Development Director Jennifer Rutledge told commissioners, as reported by the same outlet: "Absent that language, that claim still exists for vested rights based on conversations, communications, discussions that were had a couple years ago as it relates to those properties." She said such claims could end up in court.
When the board deferred that section on Sept. 22, it extended the county's temporary moratorium on data center applications through Oct. 9, the Rockdale Citizen reported.
The same UDO rewrite took effect Oct. 1 and added pre-application community meetings for certain rezonings and special use permits, plus stronger buffer, tree protection and stormwater standards. Those rules affect industrial, flex and distribution projects too, and Conyers has an I-20 distribution role. In Morgan County, a pause on data center and land deals is still in place while that county writes its own rules.
This post is general information about Rockdale County's adopted regulations, not legal or financial advice. Questions about zoning eligibility or vested rights on a specific property should go to a land use attorney and the Rockdale County Planning & Development Department.
If you own or are weighing acreage along the I-20 corridor in Rockdale, Ashley Goodroe offers commercial consultations and property valuations. Request a commercial consultation or get a property valuation.